Shanghai, China
Business Type:
Trading Company
Number of Employees:
20
Year of Establishment:
2014-08-25
Management System Certification:
ISO 9001, ISO 14001, IATF16949
Average Lead Time:
Peak season lead time: one month
Off season lead time: within 15 workdays
OEM/ODM Service
Sample Available

Transparent Cover, Plastic Shell for Electronics, Flashlight Accessories manufacturer / supplier in China, offering Transparent Cover Water Proof Junction Box, Manufacturer Customized Plastic Injection Mould / Injection Mold for Household Product / Auto Parts, Customized Disposable Food Safety Plastic Spoon by Plastic Injection Mould (Zetar Mold) and so on.

Diamond Member Since 2018
Audited Supplier
  • Transparent Cover Water Proof Junction Box
  • Transparent Cover Water Proof Junction Box
  • Transparent Cover Water Proof Junction Box
  • Transparent Cover Water Proof Junction Box
  • Transparent Cover Water Proof Junction Box
  • Transparent Cover Water Proof Junction Box

Transparent Cover Water Proof Junction Box

Get Latest Price
Min. Order / Reference FOB Price
1,000 Pieces US $0.05-0.2/ Piece
Port: Shanghai, China
Production Capacity: 1000000
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram
Material: Plastic
Type: Housing
Usage: Kitchen TV, Bedroom TV, Living Room TV
Funution: Plastic Shell
Surface Finish: Testure/Sand/Mt/Ys/Spi/EDM Finish
Colors Available: Pantone/Ral

You Might Also Like

Loading...

Basic Info

Model NO.
ZETAR
Tolerance
0.005~0.1mm
Certification
ISO9001:2008
Size
Customized Size
Biggest Part Weight
5800g/13 Pound
Plastic Modling Type
Injection
Trademark
Customized
Transport Package
Woden Packing Box for Molds and Generally Inner PA
Specification
Customized
Origin
China

Transparent Cover Water Proof Junction BoxTransparent Cover Water Proof Junction Box
Product nameOEM Plastic Precision Injection Mould Process Auto Part High Precision Auto ABS Plastic Mould for Car Bumper Manufacture
Mold shapingPlastic Injection molding,
Mold baseLKM;HASCO;DME,etc
Mold materialNAK20,S136,P20.718H,738H,45#,etc
Mold cavitySingle or Multi 
Tolerance+/-0.001mm
Finish Anodized,Polish,Silk-screen,Painting,etc
Sprue gateHot/cold runner;pin-point gate,etc
Design softwareUG,PROE,CAD,SOLIDWORK,etc
Product materialABS,PP,PE,POM,PMMA,etc
Mold life100k-500k shots
Lead time25-45 days
TransportationBy sea, by air or by land as you request
PackageStandard or as you request
OEM/ODM Acceptable
CertificateISO9001:2015,SGS,TS16949

Production Information
1-Start from part design analysis
2-Mold design drawing and DFM report available so you can see how is the mold going to be before mold making 
3-If product is complex,moldflow report will be present as well
4-In house mold making shop ensure you mold quality under well control.
5-Normally it takes 20-40 days to make mold,precise time depends on part design



Transparent Cover Water Proof Junction Box
Transparent Cover Water Proof Junction Box

Transparent Cover Water Proof Junction Box




Transparent Cover Water Proof Junction Box
Transparent Cover Water Proof Junction Box




Transparent Cover Water Proof Junction Box
Transparent Cover Water Proof Junction Box
Transparent Cover Water Proof Junction Box

Transparent Cover Water Proof Junction Box
1. Are you a trading company or a manufacturer?
We are a manufacturer as you can see our workshop as above.

2. What kind of trade terms can you do?
EX-WORKS,FOB,CIF,DDP DDU

3. What is your terms of payment?
50% Mold cost deposit,balance mold cost +50% production cost paid when samples confimed,Balance  production cost paid against copy of B/L. We accept T/T

4. Do you support OEM ?
Yes, we can produce by technical drawings or samples. 

5. How about your delivery time?
Generally, it take 40 days ( 30 days do mold and 10 days do mass production).

Welcome to contact us:
Website:www.zetarmold.com
 

 

Send your message to this supplier

*From:
*To:
avatar Mr. Mike Tang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now